Case studies

St Bonaventures

How value engineering and careful cost management from Hookway helped fulfill the Governors’ vision of rebuilding St Bonaventure’s school.

Read full case study

Office Development

Sensitive design helps meet stringent planning requirements for new commercial premises to house d&b audiotechnik UK headquarters in the Cotswolds

Read full case study

St Nicholas of Tolentine

St Nicholas of Tolentine church and its facilities required upgrading in order to meet the current needs of its vibrant and welcoming parish.

Read full case study

Holy Trinity School

Somerset local authority engaged Hookway to design and project manage the construction of a new four classroom block for Holy Trinity school in Taunton.

Read full case study

Historic conversion

Hookway were engaged to design and project manage the conversion of office space within a listed building into student accommodation.

Read full case study

Factory refurbishment

Achieving excellence through collaboration - Hookway delivers cost consultancy and CDM co-ordination for a factory refurbishment for a major industrial manufacturer.

Read full case study

Page Park - Bristol

The Friends of Page Park are a charity based in Bristol who were set up in 1999 with the aim of protecting and refurbishing Page Park in Bristol.

Read full case study

Residential pool

A private client approached Hookway to assist with providing early budget advice on a new build swimming pool within the garden of their home.

Read full case study

Cadbury College

Creating a new entrance to meet pupil needs for entering the college quickly, easily and safely whilst enhancing the visual amenity of the college buildings.

Read full case study

St Peter's School

Hookway was appointed to prepare a bid for government Condition Improvement Funding to refurbish the 12 classroom English Block for St. Peter's School.

Read full case study

DVSA

Hookway was part of the team who won the Constructing Excellence Integration and Collaborative Working Award in relation to the work done on DVSA projects.

Read full case study

Hardenhuish school

Bidding for funding and providing principal designer and project management services for the refurbishment of a Grade II* listed mansion.

Read full case study

Norton St Phillip

Design and project management of the construction of a nursery and classroom, although not a large project this was an exciting and challenging brief.

Read full case study

Clarence House

The refurbishment of Clarence House for Swindon Borough Council was particularly challenging. As a listed building the planning consent came with stringent conditions.

Read full case study

Taunton Academy

Hookway was asked by Taunton Academy to advise on funding options and develop a costed scheme to repair and refurbish their old buildings.

Read full case study

Bristol Cathedral Choir School

The religious, cultural and historic significance of this building required a considered approach to refurbishing of the roofs.

Read full case study

Property management

Hookway is experienced in residential property management. We are surveyors to the Diocese of Bristol and look after their portfolio of over 100 houses.

Read full case study

Sutton Benger

The Diocese of Bristol required a new rectory to serve the parishes of the Draycot Benefice. The site found required a sensitive design solution due to its location.

Read full case study

St. Mary Redcliffe

Hookway Chartered Surveyors has enjoyed a long and successful working relationship with St Mary Redcliffe and Temple Secondary School

Read full case study

Multi Use Games Areas

An impressive new Multi Use Games Area (MUGA) installed for St Bonaventure’s School in Bristol is just one example of many such projects that we have undertaken.

Read full case study

Norton Fitzwarren

Norton Fitzwarren, a thriving village primary school in Somerset, asked Hookway to help with a CIF funding bid and to manage two building projects.

Read full case study