Sector: Education
Service: Building Surveying

Refurbishing and modernisation of historic roofs

Bristol Cathedral Choir School is located in the heart of historic Bristol. The School was largely developed in the C16th when, after the dissolution of the monasteries, King Henry VIII made provision for the School to continue within the old monastic buildings.

The challenge

The School’s earlier buildings are now in the ownership of the Cathedral, whose built environment dates from the C12th. Worsening roof leaks affecting these buildings gave rise to a need for refurbishment and modernisation of the roofs. However, the religious, cultural and historic significance of the estate would require a considered approach to ensure the best outcome.

The solution

Hookway was appointed to secure project funding on behalf of the School, drawing together all available evidence to support the application. Following a successful bid, Hookway designed the refurbishment and renewal works, applying conservation philosophy to ensure that the significance of the buildings was protected and enhanced. Particular emphasis was given to protection of the historic fabric, selection of new materials and application of appropriate construction methods. Collaboration thereafter included full project management, including heritage & planning consultancy and contract administration, with specialist craftsmen drafted in to undertake the works. 

The result 

The project successfully delivered full and partial re-roofing of several of the School’s historic buildings. All major parts of the historic fabric were saved, including an English Oak roof, and newly-applied materials were in keeping with the original construction. Hookway continues to support the School in the care and management of its historic estate.

Related case studies

St. Mary Redcliffe

Hookway Chartered Surveyors has enjoyed a long and successful working relationship with St Mary Redcliffe and Temple Secondary School

Read full case study

St Peter's School

Hookway was appointed to prepare a bid for government Condition Improvement Funding to refurbish the 12 classroom English Block for St. Peter's School.

Read full case study

Norton St Phillip

Design and project management of the construction of a nursery and classroom, although not a large project this was an exciting and challenging brief.

Read full case study

Testimonial

“I lose count of the amount of positive comments we receive from visitors on how great the new build looks and it really fits in well with the existing building.”