Block Rebuild – Ashcombe Primary School

Ashcombe Primary School, a thriving educational establishment in Weston-super-Mare, was constructed 1969. A condition survey, completed by Hookway in 2018, led to major concerns around the suitability, condition and safety of the schools two large teaching blocks and we were appointed to assist with putting plans in place to replace the two blocks. Designs were drawn […]