Sector: Education
Service: Building Surveying

Refurbishing and modernisation of historic roofs

Bristol Cathedral Choir School is located in the heart of historic Bristol. The School was largely developed in the C16th when, after the dissolution of the monasteries, King Henry VIII made provision for the School to continue within the old monastic buildings.

The challenge

The School’s earlier buildings are now in the ownership of the Cathedral, whose built environment dates from the C12th. Worsening roof leaks affecting these buildings gave rise to a need for refurbishment and modernisation of the roofs. However, the religious, cultural and historic significance of the estate would require a considered approach to ensure the best outcome.

The solution

Hookway was appointed to secure project funding on behalf of the School, drawing together all available evidence to support the application. Following a successful bid, Hookway designed the refurbishment and renewal works, applying conservation philosophy to ensure that the significance of the buildings was protected and enhanced. Particular emphasis was given to protection of the historic fabric, selection of new materials and application of appropriate construction methods. Collaboration thereafter included full project management, including heritage & planning consultancy and contract administration, with specialist craftsmen drafted in to undertake the works. 

The result 

The project successfully delivered full and partial re-roofing of several of the School’s historic buildings. All major parts of the historic fabric were saved, including an English Oak roof, and newly-applied materials were in keeping with the original construction. Hookway continues to support the School in the care and management of its historic estate.

Related case studies

Bristol Cathedral Choir School

The religious, cultural and historic significance of this building required a considered approach to refurbishing of the roofs.

Read full case study

St Bonaventures

How value engineering and careful cost management from Hookway helped fulfill the Governors’ vision of rebuilding St Bonaventure’s school.

Read full case study

Christ Church Primary school

Hookway helped Christ Church CofE Primary School secure Healthy Pupils Condition Improvement Funding, and install a fabulous new Multi-Purpose Games Area.

Read full case study

Testimonial

“Hookway came highly recommended and we are absolutely delighted with the project.”

“Hookway recently secured funding through CIF to install a new playground surface (MUGA) for our front playground to help improve the PE opportunities and safety aspects for the children. The children are over the moon about their new playground, and are already enjoying safer and more interesting playtime and sports lessons.”

“Tom's advice and guidance, were as usual exemplary and he helped trouble-shoot any practical problems that arose to get the work completed on time and in budget. ”