The Construction (Design & Management) Regulations 2015 (CDM) were introduced with effect from 6 April 2015. The Regulations impose duties upon all members of the construction team, including clients, designers, principal contractor and contractors, and also introduce the new role of Principal Designer.

The aim is to ensure that health and safety is improved by encouraging everyone involved to work together to improve the planning and management of projects from the very start through to completion of the works and even beyond to repair and maintenance.

Hookway is able to undertake the role of Principal Designer as required by the CDM Regulations. Our in depth knowledge of all aspects of the design and construction phase of building, together with our appreciation of health and safety matters and understanding of the CDM Regulations puts us in an excellent position to provide Principal Designer services.

If you want to know more please call or email and we will get back to you as quickly as possible.

0117 955 4545

Testimonial

“Our old sports hall has now been transformed into a multi-purpose performance space with a professional stage lighting and sound rig. What a transformation! Tom Bishop from Hookway listened very carefully to our requirements and then went about designing the new Norton Hill Arts Theatre. With cherry panelling and sound absorbent materials the main room has amazing acoustics, perfect for concerts and performances alike.”

“Tom's advice and guidance, were as usual exemplary and he helped trouble-shoot any practical problems that arose to get the work completed on time and in budget. ”

“I lose count of the amount of positive comments we receive from visitors on how great the new build looks and it really fits in well with the existing building.”

News

Read all news
 Cube decal

CIF OUTCOME - 2022/23

The Condition Improvement Fund (CIF) 2022/23 results have been announced and Hookway is delighted to have achieved a 75% success rate on bid applications.

Read More
 Cube decal

Block Rebuild - Ashcombe Primary School

Hookway overcame a CIF funding challenge for Ashcombe Primary School who had major concerns around the suitability, condition and safety of its two large teaching blocks.

Read More
 Cube decal

CIF bid applications 2023-24

The deadline is fast approaching for bid applications for CIF 2023-24. If you’re considering applying we can help you prepare your application ready to submit.

Read More