This websites use cookies. By continuing to browse the site you are agreeing to our use of cookies. For more details about cookies and how to manage them, see our cookie policy.

Sector: Education
Service: Cost Consultancy | Project Management

Transforming school buildings through refurbishment 

St Peters High School is a large Secondary Academy with a significant amount of original 1960`s asbestos clad teaching blocks, which are now in poor condition and visually very uninspiring. Rebuilding or refurbishment was required.

The challenge

The Governors and senior management had always considered that funding would become available to demolish and completely rebuild the old buildings at the top of the site and plans were drawn up. However, funding was illusive and the school buildings continued to deteriorate, creating a poor environment for students and staff. Hookway were consulted and after reviewing funding options, it was apparent that the best way forward would be for the Academy to begin a programme of refurbishment of the old blocks, for which funding was available.

The solution - CIF Funding

Hookway was appointed to prepare a bid for government Condition Improvement Funding (CIF) to refurbish the 12 classroom English Block and the bid was successful. Hookway were appointed as cost consultants and project managers for the project and worked with Graham Rivers Architects to produce a cost effective scheme that transformed the look and feel of the building.

The result

The English Block has been transformed from a run down 1960`s classroom block to a modern block which looks likea new building. Thermal and acoustic properties have been improved ensuring an improved environment for learning.  The job was completed on time and on budget. The school are now continuing with the refurbishment of other blocks.

Related case studies

St. Peter's High School

Hookway worked with contractors, Lancer Scott, to provide a complete internal re-modelling and refurbishment of the Sixth Form Block of St. Peter's High School Sixth Form Centre.

Read full case study

Block Rebuild - Ashcombe Primary School

Ashcombe Primary School is a thriving educational establishment that was originally constructed back in 1969.

Read full case study

CIF 2019 - project round up

Hookway's surveyors worked on numerous CIF projects for schools and academies in 2019, ensuring that all work was completed in time for the start of a new academic year.

Read full case study

Testimonial

“Hookway worked in close partnership with us and carefully managed a range of trades and contractors. Greg Smith, Hookway’s Surveyor, met with my team regularly and always acted upon any feedback shared; he cared passionately about the quality of the work and made sure that it was completed to an excellent standard.’”

“This year we had two bids totalling over a one million pounds for Lawn Manor. Our new boilers and plant, and new roof projects have gone completely smoothly, safely and within budget.”