Sector: Residential
Service: Cost Consultancy | Principal Designers

Private pool - a flexible approach ensures the project goes swimmingly  

A private client approached  Hookway to assist with providing early budget advice on a new build swimming pool within the garden of their home.

The challenge

Throughout the design development Hookway provided feedback to both the design team and the client to achieve a scheme that met stringent planning and environmental issues whilst retaining the design intent for a cost that was acceptable.

To meet the programme and have the pool operational in a very short timeframe, detailed procurement routes and associated risks were explored and explained to the client to enable them to make informed decisions. Hookway was retained throughout the works to provide a full cost management and Principal Designer role.

The solution

Once a design had been agreed and planning obtained the project was procured under a two stage tender process. The works were then let on an ‘open book’ basis using highly collaborative project management to enable detailed design to continue whilst the very complex foundations were being constructed.

The route chosen allowed the pool to be completed in a shorter timeframe than may otherwise have been possible under traditional procurement methods. The design and every detail of the works was also paramount and the procurement route enabled very tight control of such to be retained by the designer and client.

The result

The final project was completed to a very high standard of finish to the delight of the client. Due to the flexible nature of the contractor and procurement path, the landscaping works were also able to be completed by utilising excavation plant whilst it was not being used on the building works, thus saving unnecessary additional costs. The design was also able to be revised as works proceeded to enable the client to have exactly what they wanted without becoming exposed to potentially expensive claims that can often occur under more traditional procurement routes.  

Related case studies

Social Housing Project, St. Judes

Hookway was recently selected by a Bristol-based Housing Association to assist them with essential fire compliance works at a residential block of flats situated in the city centre.

Read full case study

Private Residence, Montpelier Conservation Area

This privately owned property is a grade 2 listed building situated within the Montpelier conservation area of Bristol.

Read full case study

Factory refurbishment

Achieving excellence through collaboration - Hookway delivers cost consultancy and CDM co-ordination for a factory refurbishment for a major industrial manufacturer.

Read full case study

Testimonial

“Hookway was instrumental in securing The Redstart Learning Partnership schools crucial Salix LCSF funding. This grant will provide us with invaluable energy appraisal surveys, which will greatly enhance our chances of being awarded PSDS capital funding for decarbonisation projects. ”

“Hookway have worked in collaboration with us to deliver this transformation project and have provided regular clear communication throughout which has helped with the smooth running of the project. The project team have all played a vital role in this year-long programme and we’re delighted the project has finished on time and on budget.”

“Tom's advice and guidance, were as usual exemplary and he helped trouble-shoot any practical problems that arose to get the work completed on time and in budget. ”