This websites use cookies. By continuing to browse the site you are agreeing to our use of cookies. For more details about cookies and how to manage them, see our cookie policy.

Sector: Education
Service: Project Management

St Peter’s High School is a Catholic Academy School and Sixth Form Centre, situated on Stroud Road in the Tuffley area of Gloucester. The Sixth Form building itself was well constructed approximately 20 years ago, but the internal layout had become somewhat of a labyrinth with many small rooms and a design that was not well suited to the needs of the students. Hookway was therefore appointed to work with Contractors Lancer Scott in order to redesign this layout, providing a complete internal re-modelling and refurbishment of the Sixth Form Block. The project was self-funded by the school.

Complete Design and Project Management Services

The project started in June 2021 with Hookway presenting multiple design options for the school to evaluate. The chosen scheme was then tendered before refurbishment works began, with Hookway providing full project management services throughout. Works included the complete refurbishment of the student washrooms, whilst internal walls were removed elsewhere in order to create open-plan study areas for independent and group work. All new internal surfaces were also specified and installed including new flooring, walls and suspended ceiling with integrated lighting.

Work completed ready for the start of the new academic year

All works were completed by the end of August 2021. Indeed, the school was particularly impressed that the newly designed building was fully open in time for the start of the new academic year, despite the well publicised delays with materials across the construction sector. This highly successful project has led to a total transformation of the Sixth Form Center, which now provides a modern, business-like learning environment for students to thrive in.

Business Manager, Jo Franklin, said: “We are delighted with the standard of workmanship shown during this important refurbishment project, and the professional design and project management services provided by Hookway were critical to achieving a successful outcome. We now have a modern, dynamic facility which truly meets the needs of our Sixth Form students and teaching staff.”

Related case studies

Holy Trinity School

Somerset local authority engaged Hookway to design and project manage the construction of a new four classroom block for Holy Trinity school in Taunton.

Read full case study

Block Rebuild - Ashcombe Primary School

Ashcombe Primary School is a thriving educational establishment that was originally constructed back in 1969.

Read full case study

Multi Use Games Areas

An impressive new Multi Use Games Area (MUGA) installed for St Bonaventure’s School in Bristol is just one example of many such projects that we have undertaken.

Read full case study

Testimonial

“The whole project has been a complete success from start to finish. Hookway and the builders (HBC) were a pleasure to deal with and the project management was highly professional.”

“Hookway have been fantastic for us, they have prepared all of our bids and CIF has made huge difference to our buildings over recent years. ”

“I lose count of the amount of positive comments we receive from visitors on how great the new build looks and it really fits in well with the existing building.”